Getting Started
Measure twice, cut once
Originally I was going to build a 120V system with plans to upgrade to 220V down the road.
Measure twice, cut once
Greenlee hole punch
Be Patient
The Guts
Originally I was going to build a 120V system with plans to upgrade to 220V down the road.
I switched gears and decided to opt for a 50A system with DIN rails
src="https://c6.staticflickr.com/8/7645/28163825765_b33f301507_z.jpg" width="640" />
src="https://c6.staticflickr.com/8/7645/28163825765_b33f301507_z.jpg" width="640" />
Beginning to take shape
Basement Work Station
Switched to Back to Back system now, relocated switch and added yellow LED for corresponding PID (heating Element)
Heating Elements from THEELECTRICBREWERY.COM
These will be housed in the HLT and BK
There is already a RIMS unit fully built and ready for power wire to be attached.
These will be housed in the HLT and BK
There is already a RIMS unit fully built and ready for power wire to be attached.
Element Enclosures
Brewhardware.com
Brewhardware.com